IOSOR Learn
Auto-Recharge Settlement Cutoff vs PAYG Liquidity Prepositioning
How to size PAYG balance ahead of each PSP settlement batch cutoff so auto-recharge budgets clear before the SMS wallet depletes, and how to verify routes.
Lead Telecom & Routing Architect · Lausanne, CH
Preposition enough PAYG balance to cover messaging spend from your last confirmed budget until the next PSP settlement batch actually clears, not until the cutoff timestamp. Size it from peak hourly burn multiplied by cutoff lag plus the failover buffer you require.
Map PSP settlement cutoffs against your real wallet burn curve
Start by establishing, per PSP, the exact cutoff moment (timezone and business-day rollover included) and the observed clearing lag between instruction initiation and funds credited to the messaging wallet. Pull 30 days of budget timestamps and compare them to the settlement batches that actually funded them.
Compute the prepositioning target from burn, lag, and retry depth
With the exposure window measured, set the target balance as peak hourly burn multiplied by exposure hours, then add the cost of one failed budget attempt and its retry interval. This gives a working floor that survives a single soft decline without triggering depletion. Cap the figure at your tolerance for idle balance: money parked above the target is liquidity you cannot redeploy.
Separate cutoff timing failures from funding failures
A depleted wallet during auto-recharge has two distinct root causes and they need different fixes. Timing failure means the budget was initiated too close to cutoff and missed the batch; the fix is schedule, not amount. Funding failure means the instruction cleared but the rail declined or reversed; the fix is retry logic and balance headroom.
Verify partner routes on cutoff, fee, and failover before committing balance
For each route under consideration, verify four things in writing: the settlement cutoff schedule including holiday handling, the all-in cost per attempted budget including declines, the failover path when the primary rail is unavailable, and the evidence format for credited funds.
Cross-check cadence, batch alignment, and allocation before locking the number
Your prepositioning target is only as good as the reconciliation loop behind it. Align the budget schedule to the actual settlement batch calendar, and audit reconciliation cadence so a missed credit is caught within one cycle rather than at month end. Confirm how partial budgets are allocated when a batch funds only part of the instruction — the residual changes your effective floor.
Start with IOSOR
Run the checklist concretely. First, export 30 days of budget instructions with initiation time, expected batch, confirmed credit time, and wallet balance snapshots. Second, compute peak hourly burn and the measured exposure window per corridor. Third, set the target as burn × exposure hours plus one retry cost, and document the assumption. Fourth, verify DLR receipt coverage and webhook latency for the balance signal feeding auto-recharge.
Related: PAYG hold before first debit · Wallet stop-lines before production.
IOSOR takeaway
Start by establishing, per PSP, the exact cutoff moment (timezone and business-day rollover included) and the observed clearing lag between instruction initiation and funds credited to the messaging wallet. Confirm how partial budgets are allocated when a batch funds only part of the instruction — the residual changes your effective floor (/tools/brief · DLR / webhook).
Was this guide helpful?
Related guides
- Auto-Recharge budget Velocity Throttling and Queue Depth Controls
Decide concurrency caps and queue depth for auto-recharge budgets so PSP rate limits and wallet concurrency never cause silent send stalls.
- Calibrating Auto-Recharge Trigger Thresholds Against Real Burn Rate
Set the auto-recharge trigger from measured burn rate and PSP latency, so budgets fire before send-rate spikes drain the wallet without leaving idle float.
- Auto-Recharge Threshold Band Sizing: Evidence Audit Before Route Compare
Audit the trigger band before you compare routes: quantify depletion latency, DLR receipts, and fee bands so every threshold carries defensible evidence.












