IOSOR Learn
Verify sim swap cooldown window cutover checklist on launch routes
Check sim swap cooldown cutover on launch routes before raising volume, then compare partner routes in /tools/brief.
Lead Telecom & Routing Architect · Lausanne, CH
Confirm sim swap cooldown windows are fully cut over on launch routes before increasing traffic volume. Validate DLR receipts, webhook latency, and sender/template gates per route, then compare verified partner routes in /tools/brief.
Pre-cutover cooldown verification
Audit current sim swap cooldown settings across all launch routes. Confirm cooldown windows match the launch specification and no route remains in legacy mode. Record baseline DLR receipts and webhook latency before any volume change. Enforce cooldown thresholds of 300 seconds minimum for SIM swap events and 60 seconds for number portability events; reject any route below these limits. Verify DLR receipt timestamps align with submission time within 5 seconds tolerance and webhook delivery latency stays under 2 seconds p95. Flag routes with missing receipts or latency above threshold for remediation before cutover sign-off.
Volume raise gate criteria
Do not raise volume until cooldown cutover is verified on every active route. Check DLR receipt timestamps, webhook delivery latency, and sender/template approval status. Block volume increases if any route fails cooldown validation. During pre-flight verification, validate that automatic failover thresholds trigger deterministic rerouting without duplicating outbound segments or exhausting retry backoff budgets under peak regional load. Set failover trigger at 3 consecutive failed DLRs or webhook latency exceeding 5 seconds p99; cap retry attempts at 4 with exponential backoff starting at 1 second. Confirm no duplicate segments are generated during rerouting events.
DLR receipt and webhook checks
Inspect DLR receipts for final status codes and delivery confirmation. Measure webhook latency from message submission to delivery report. Flag routes with missing receipts or latency above threshold for remediation before cutover sign-off. Require DLR final status codes of DELIVERED, UNDELIVERED, or EXPIRED only; treat UNKNOWN or PENDING beyond 300 seconds as failures. Verify webhook HMAC signatures on every delivery report and reject unsigned payloads. Compare live route telemetry, throughput ceilings, and SLA stability inside the Decision Brief workflow (/tools/brief) so primary and standby paths maintain continuous operational compliance.
Sender and template gate validation
Verify sender IDs and message templates are approved for each launch route. Confirm template variables match E.164 formatting and OTP content rules. Reject routes with unapproved senders or templates from volume increase. Validate sender ID length between 3 and 11 alphanumeric characters and template variable placeholders strictly follow {{otp_code}} format with 6-digit numeric OTP content.
Partner route comparison via /tools/brief
Open /tools/brief?job=compare&cluster=launch to compare partner routes for your channel and corridor. Review cooldown windows, DLR performance, and webhook latency side by side before selecting routes for volume scaling.
Start with IOSOR
Begin verification in IOSOR by loading the launch route inventory. Run cooldown cutover checks, capture DLR receipts and webhook metrics, then use /tools/brief to compare verified partner routes for your channel/corridor before raising volume.
- Day-1 runway: what must be green.
- Verify ASN Velocity Rate Limit Pre-Launch Validation.
- When launch is blocked: status without lying.
IOSOR takeaway
Audit current sim swap cooldown settings across all launch routes. Review cooldown windows, DLR performance, and webhook latency side by side before selecting routes for volume scaling (/tools/brief · DLR / webhook).
Was this guide helpful?
Related guides
- Verify Subtenant Webhook Isolation and SLA Enforcement Gate on Launch Routes
Operators must prove subtenant webhook isolation and SLA enforcement on launch routes before raising volume, then compare partner routes in /tools/brief for the same channel and corridor.
- Sender ID Approval and Alphanumeric Registration Gate Before Launch
Verify sender IDs and alphanumeric originators are approved per destination before first volume, preventing blocked or spoofed traffic at launch.
- Sender ID and Alpha Tag Provisioning Audit Before First Volume
Verify every sender identity, alpha tag, and short-code mapping is carrier-approved and DLR-traceable before your first production send.












